SAFEWAY
Gomer is at present involved with a number of refrigeration companies in connection with the Safeway conversion to Morrisons Stores programme in various areas of the country.
The works carried out at the above installations were as follows
- The complete installation of hangers / brackets & tray work.
- Installation of numerous XLPE/LSF multicore cables.
- Installation of mains power distribution boards including sub boards.
- Installation of a JTL / CDK refrigeration control & alarm system.
- Installation of coldroom lighting including emergency lighting.
- Installation of an entrapment alarm system to the refrigeration coldrooms.
- Refrigeration packs conversions of control wiring and compressor's.
- An NICEIC Periodic Inspection on all the existing refrigeration equipment
- PAT Testing on the portable equipment including the store integral cases.
- An NICEIC Installation completion certificate on all the new refrigeration equipment.

|